Project Scope: Replace failed aeration blowers with modern, efficient units. Remove redundant equipment. Upgrade control. Optimise system.
The Old Installation, just before two of the three blowers failed.
Hire machines placed before site was established making access tothe blowerhouse challenging
Two new machiens installed and running in conjunction with the surviving old machine
The almost finished article: